Skip to content

Find a race / California

Grizzly Peak Century Ride

Sun, May 2, 2027

Grizzly Peak Century Ride

Moraga, California

UltraBikeRegistration open
  • Running events
  • Walker friendly not tagged
  • Dog friendly not tagged
  • Stroller friendly not tagged
Terrain
Hilly (estimated)

Based on elevation around the start area, not the exact course.

Time zone
Pacific Time
Start area
St. Mary's College, 1928 St. Marys Rd.
ZIP
94575

Events

30 miles

$60

30 miles · Bike

Sun, May 2, 2027 at 9:30 AM PT

No time limit listed

Registration closes Sun, May 2, 2027

The 30 mile course has about 2,000 feet of climbing, so it isn't easy!

70K (Gravel)

$90

70K · Bike

Sun, May 2, 2027 at 7:30 AM PT

No time limit listed

Registration closes Sun, May 2, 2027

The 70K gravel route explores some of the greatest hits in our wonderful East Bay Regional parks. The 70K route is identical to the 100K route without the early morning loop through Lake Chabot Park, so you should have some company on the trails. After a 4 mile paved lead-in, you'll hit the dirt to traverse Redwood Park on Eastridge Trail. Then enjoy the paved Skyline Drive and our namesake Grizzly Peak Blvd enroute to Seaview and other trails in Tilden Park. After the rest stop at Island Picnic Area you'll head down Wildcat Creek and then up and over the ridge to join the road riders for the trip back to St Mary's. The course covers about 41 miles with about 3,800 ft of elevation gain.

50 miles

$90

50 miles · Bike

Sun, May 2, 2027 at 7:30 AM PT

No time limit listed

Registration closes Sun, May 2, 2027

The 50 mile course has about 4,400 feet of climbing. It is the heart of the 75 mile course but skips the northern portion. It offers plenty of climbing and great views. From the start at St Mary's College it climbs the east side of the Oakland-Berkeley hills via Pinehurst Road, then follows the ridge up and over Grizzly Peak and into Tilden Park to the rest stop at Island Picnic Area. It then continues on the ridge and around the north end of the Berkeley Hills to Castro Ranch Road. Then it's on to the Three Bears with a rest stop at Briones Regional Park. Finally, relatively easy riding on Moraga Way takes you back to the start for the post-ride meal.

100K (Gravel)

$100

100K · Bike

Sun, May 2, 2027 at 6:30 AM PT

No time limit listed

Registration closes Sun, May 2, 2027

The 100K gravel route explores some of the greatest hits in our wonderful East Bay Regional Parks. You'll start with a morning loop through Anthony Chabot Park before the first rest stop. Then traverse Redwood Park on Eastridge Trail and enjoy the paved Skyline Drive and our namesake Grizzly Peak Blvd enroute to Seaview and other trails in Tilden Park. After the rest stop at Island Picnic Area you'll head down Wildcat Creek and then up and over the ridge to join the road riders for the trip back to St Mary's. The course covers about 61 miles with about 6,000 ft of elevation gain. This route will challenge you while helping sharpen your early season fitness and affording you the beauty of the East Bay.

75 miles

$95

75 miles · Bike

Sun, May 2, 2027 at 7:30 AM PT

No time limit listed

Registration closes Sun, May 2, 2027

The 75 mile (actually about 73 mile) course with about 6,200 feet of climbing is our most popular route. From the start at St Mary's College it climbs the east side of the Oakland-Berkeley hills via Pinehurst Road, then follows the ridge up and over Grizzly Peak and into Tilden Park to the rest stop at Island Picnic Area. It then heads north to the edge of the Bay and the Carquinez Strait to the rest stop at Port Costa. From there it climbs McEwen Road for a run down into Franklin Canyon and Alhambra Valley, then over Pig Farm Hill and through the hills around Briones Reservoir to the rest stop at Briones Regional Park. Finally, relatively easy riding on Moraga Way takes you back to the start for the post-ride meal.

100 miles

$100

100 miles · Bike

Sun, May 2, 2027 at 6:30 AM PT

No time limit listed

Registration closes Sun, May 2, 2027

The 100 mile course has roughly 9,000 feet of climbing. The route starts with an early morning south loop to the Ivy Park rest stop. Then it climbs the east side of the Oakland-Berkeley hills via Pinehurst Road, and follows the ridge up and over Grizzly Peak and into Tilden Park to the rest stop at Island Picnic Area. It then heads north to the edge of the Bay and the Carquinez Strait to the rest stop at Port Costa. From there it climbs McEwen Road for a run down into Franklin Canyon and Alhambra Valley, then over Pig Farm Hill and through the hills around Briones Reservoir to the rest stop at Briones Regional Park. Finally, relatively easy riding on Moraga Way takes you back to the start for the post-ride meal.

About this race

There are four paved routes and two gravel routes to choose from, all of them very hilly: 

30 miles (~2,600 ft of climbing)
50 miles (~4,200 ft of climbing)  
75 miles (~5,900 ft of climbing)  
100 miles (~8,700 ft of climbing) 
70K Gravel (~4,200 ft of climbing) 
100K Gravel (~6,500 ft of climbing)

Related from Jon's blog

These posts live on the Jon Wade Running site.

  • Wed, Nov 18, 2026

    10 Mile Workout with 2×2 mile pace work

    Free Workout – 10 Mile / 2×2⁠ ⁠ Warmup 3 miles⁠ 2 miles at 10k Pace⁠ 1 mile easy⁠ 2 miles at 5k pace⁠ Cooldown 2 miles⁠ ⁠ Sync the workout to your Garmin or…

  • Tue, Nov 17, 2026

    Pumpkin Spice Protein Muffins (Gluten Free)

    Thanksgiving week is basically a holiday for runners. There’s a turkey trot in the morning, a big meal in the afternoon, and pie somewhere in between. I’m not…

  • Mon, Nov 2, 2026

    Marathon Carb Loading: A Simple Guide for Runners

    Carb loading doesn’t mean eating a mountain of pasta the night before your marathon. And it definitely doesn’t need to be complicated. It’s simply a way to…